The problem is described in this thread:
Read this for context.
Here is a rough sketch of my situation:
[image]
Green are interday learning cards (This problem does not occur with fresh new-turned-into-learning cards). Provided that there is a backlog of interday learning card (lets say 20 cards), the reviewer would continue to cycle through all of these 20 cards and then back to the beginning, with no regard to how short the again interval. I sense it follows a queue.
This is cumbersome and very exhausting, and cognitive load sk…
I found that downgrading to 2.1.40 and de-selecting the V2 scheduler in Tools->Preferences->Scheduling (aka downgrading to V1) restored this functionality (you must also have at least one very small learning step). As of 2.1.41, we cannot downgrade to V1.
2 Likes
If this is true, wouldn’t it be wise to reverse this. What happened in the first place that made v3 do this
I encountered this in v2.
system
Closed
January 17, 2025, 11:18pm
5
This topic was automatically closed 30 days after the last reply. New replies are no longer allowed.