Replace CMRR with workload-vs-DR graph (+more)

the relationship between the total knowledge and DR is not linear

It is though. Examples from the simulator:

Unless you mean a situation where new cards/day is not fixed and is instead dynamic. If new cards/day is a constant, the relationship is linear. And we simulate a fixed number of new cards/day, in every simulation. There is no option for making it dynamic.