FSRS 5: <1d Scheduling and Learning Steps

Because the minimum value of stability is 0.01. And 0.01 day = 864 seconds = 14.4 minutes. Your desired retention is 95%, so the interval is shortened from 14.4 minutes to 9.22 minutes.

6 Likes